Rules & Design Standards

About the Rules of the Washtenaw County Water Resources Commissioner

The Rules embody a shift in stormwater management philosophy. Where in the past these rules have governed stormwater management from a flood control perspective, they have been revised to include design standards that provide more sophisticated quantity control, and directly address water quality.

These revisions are based upon the most current body of knowledge concerning stormwater management from across the state and country, modified as appropriate for application in Washtenaw County. A Technical Advisory Committee, representing both public and private interests within the County, contributed extensively to the content of these rules throughout the revision process.

These rules were issued pursuant to Section 105(c) of Act 591 of the Public Acts of Michigan of 1996, as Amended and The Michigan Drain Code Public Act of 1956, as Amended.

- Evan N. Pratt
Washtenaw County Water Resources Commissioner

Procedures & Design Criteria for Stormwater Management Systems (PDF)

Rules and Guidelines - Procedures and Design Criteria for Stormwater Management Systems cover image

Was this page helpful for you? Yes No